Die Hochzeit der beiden Brücken-Enden steht kurz bevor, doch noch muss eine riesige Stufe beseitigt werden.
IMAGO/Pixsell
Connecting the bridge over the Cetina River near Omis, Croatia Photo taken on February 10, 2023 shows the final phase of connecting the bridge over the Cetina river at 70 meters above sea level, in Omis, Croatia. The Omis bypass is one of the largest infrastructure projects in the Split-Dalmatia County and is valued at â24m. Bypass include two tunnels, Komorjak more than 600 meters long and Omis more than 500 meters long, and a bridge across the Cetina river with a length of 216 meters. IvoxCagalj/PIXSELL
Jetzt E-Paper lesen